Process
- Utility Locates: Call 811; mark existing lines; plan route.
- Trench Excavation: Depths and widths per utility type; safe sloping or shoring.
- Bedding: Clean sand or gravel as required for pipe/conduit support.
- Placement: Install pipe, conduit, or cable per spec.
- Backfill: Lift-by-lift with proper compaction to prevent settlement.
- Restoration: Restore surfaces; reseed or gravel as needed.
Safety & Compliance
We follow local codes, depth requirements, separation standards, and trench safety best practices.
Technical Diagrams
Trench Cross-Section
Set pipe on compacted bedding, backfill in lifts, and place warning tape above for future locates.
Separation Distances
Maintain minimum separations between utilities; verify local code requirements before trenching.